CONSTRUCTION OF SEWAGE AND STORMWATER NETWORK IN PART OF THE SINJORETOVO AREA, CITY OF ZADAR
Client:
Odvodnja d.o.o. Zadar
Period:
March 2020 - July 2022
Services:
  • Expert supervision and work safety coordinator

CONSTRUCTION OF SEWAGE AND STORMWATER NETWORK IN PART OF THE SINJORETOVO AREA, CITY OF ZADAR

This project resolves the issue of stormwater and sewage using separate collectors, a drainage distribution system. The sewage collectors are connected to the constructed collector in Augustin Kažotić street and directly to the Zadar Wastewater Treatment Plant. The collected stormwater is released into the tributary Ričina, after passing through the sand traps and rain sieves equipped with a sedimentation basin. The area covered by the project is east of the Ričina tributary, thereby covering a large part of the Sinjoretovo suburb.

The total length of the sewage system is 5,794 metres, and 3,308 metres for the stormwater system, along with 377 prepared locations for household connections.