Client:
Vodovod i kanalizacija d.o.o. SplitPeriod:
March 2024 -Services:
- Project Manager
CONSTRUCTION OF THE WATER SUPPLY SYSTEM FOR THE SEVID NA MORU SETTLEMENT
Sevid na moru, the only coastal settlement in the Municipality of Marina without a public water supply system, is currently supplied with drinking water through private water tanks. The settlement has 160 permanent residents and up to 1,400 seasonal residents, with a growing population trend.
The scope of the contract includes the construction of a water reservoir with a capacity of 250 m³, associated pipelines with a total length of 1.679 km, and a water supply network with a total length of 9.928 km. This will enable connection to the public water supply system for 373 households. The water supply will be achieved by connecting to the main pipeline of the Krka water supply system.
The value of the contracted works is 3.189.812,52 EUR excluding VAT.
The realization of the project will improve the quality and availability of drinking water, contributing to the preservation of water resources and compliance with EU Directives.