Client:
Hrvatske ceste d.o.o.Period:
February 2006– April 2012Services:
- Planning engineer
- Site engineer
- Contractor’s Project Manager
- Safety Coordinator II
STATE ROAD D8, SECTION OREHOVICA – SVETI KUZAM, LOT 0, 1 AND 2
Two viaducts „Vežica“ – 660 m and two viaducts „Draga II“ – 220 m, 125 precast pre-stressed beams 90 tons of weight and 30 m long; two pedestrian overpasses; Interchange „Orehovica“; Two underpasses; alignment works of all kind – excavation, filling – 480.000 m3, excavation slopes protection – IBO anchors (5000 pieces of 9 to 16 m long), shot crete 20.000 m2, at casing method of boring, bored pipe drains etc.; water works steel and DI pipes ϕ 150 mm to 700 mm – new construction and relocation of existing water mains; foul sewerage works – DI and HDPE pipes ϕ 150 to 400 mm, new and existing, gravity and pressurized; reconstruction of parallel local roads under traffic – 4 km; execution of tunnel beneath the international railway Rijeka – Budapest, execution of auxiliary structure for temporary railway bridge - 30 m span.