WORKS ON THE DRAINAGE SYSTEM - GRAVITY COLLECTORS AND PUMP STATIONS "BOŽAVA" AND "BOŽAVČICA" WITH RELATED PRESSURE PIPELINES, AND WASTEWATER TREATMENT FACILITIES
Period:
Junuary 2024 -
Services:
  • Project management

WORKS ON THE DRAINAGE SYSTEM - GRAVITY COLLECTORS AND PUMP STATIONS "BOŽAVA" AND "BOŽAVČICA" WITH RELATED PRESSURE PIPELINES, AND WASTEWATER TREATMENT FACILITIES

The project involves construction works on the drainage system, including gravity collectors and pump stations "Božava" and "Božavčica" with associated pressure pipelines, and a wastewater treatment facility.

The works consist of two groups:

  1. Procurement and installation of wastewater treatment facilities
  2. Procurement and installation of gravity collectors and pump stations "Božava" and "Božavčica" with related pressure pipelines

The total project value is 3.441.057,20 EUR excluding VAT, and the total eligible costs amount to 2.752.845,76 EUR excluding VAT. Non-refundable funds in the amount of 2.202.276,61 EUR excluding VAT have been allocated from the Recovery and Resilience Mechanism.

The project's objective is to improve the quality of life in the Božava settlement by constructing a drainage system, wastewater treatment facilities, and an underwater outlet. The targeted group of the project is the residents of Božava, who will have the opportunity to connect to the new public drainage system after the project's implementation.