ZAGREB – SPLIT MOTORWAY, SECTION BOSILJEVO - JOSIPDOL, MOST DOBRA
Client:
Bechtel Enka JV.
Period:
July 2001 – January 2002
Services:
  • Contractor’s Chief Site Manager, Safety Coordinator II, Planning Engineer and the Contract Manager

ZAGREB – SPLIT MOTORWAY, SECTION BOSILJEVO - JOSIPDOL, MOST DOBRA

Sub-structural works on two bridges „Dobra“ – 180 m, slab foundation in rock 6 meters beneath river „Dobra“ water level, water pumping from the excavation pit, hollow section piers 40 m high, pier caps 11 m cantilever on both sides – free cantilever method (cast on site), preparation for precast beams installation, 3 overpasses – „Mirići“, „Malik“ and „Kneževići“, 3 underpasses – „Tuturovići“, „Otok na Dobri“ and „Bartolovići“, 54 precast pre-stressed beams 35 tons of weight and 20 m long each.