Client:
Hrvatske autoceste d.o.o.Period:
March 2002 – September 2003Services:
- Planning engineer
- Site engineer
- Contractor’s Project Manager
- Safety Coordinator II
ZAGREB – SPLIT MOTORWAY, SECTION SV. ROK – ZADAR II
Two viaducts „Rovanjska“ 180 m, two viaducts „Crna Draga“ – 230 m, 180 precast pre-stressed beams 90 tons of weight and 30 m long, bridge „Baštica“ – 90 m, 3 underpasses; road works – 5 km motorway, 870.000 m3 of rock excavation – blasting, filling works, subbase, asphalt works, terramesh protection of embankment slopes due to very steep original ground, drainage pipe work – impermeable reinforced concrete pipes, protection of excavation pit slopes with wired mesh – slopes of up to 90 m height.