Client:
Hrvatska uprava za cestePeriod:
–Services:
- Head of Structural Works for the Contractor
ZAGREB – VARAŽDIN MOTORWAY, SECTION: VARAŽDIN - ČAKOVEC
Bridge over river „Drava I“ – 550 m, 55 pre-stressed precast girders, 44 bored piles 30 m long ϕ 120 cm, works inside the river current; bridge „Kanal Plitvica“ – 30 m, slab foundation 6 meters beneath the GWL, engagement of strong water pumping facilities, execution of the temporary bypass trench in order to divert the water in rain season; overpass „Zamlaka“ – 160 m, slab foundation, precast pier caps, precast reinforced concrete beams – 36 pieces.